How do the two U5 control packages differ?
Both require washing, instant water heating, heated seating, warm-air drying and on-unit buttons. The remote package adds one compatible U5 handheld controller and one wall holder per toilet. Voice control and automatic lid operation are not selected.
What water, seat and air temperatures are listed for U5?
Both purchase packages require the listed water and seat choices of Off, 34, 37 and 40 °C, and the listed air choices of Off, 35, 45 and 55 °C. Washing, seating and drying remain separate functions. The supplied U5 function sheet must match this requirement.
How is the U5 electrical configuration selected for the destination?
This selection uses a 220 V, 50 Hz unit, with nameplate, earthing and cord or connection arrangement matched to the destination. For another voltage or a 60 Hz supply we specify a unit configured and documented for it. The 1350 W figure is a power rating, distinct from energy use per visit.
Can U5 be specified for a low-pressure or boosted water supply?
Suitability depends on the selected unit’s permitted inlet-pressure range and the actual site supply, including any booster pump. The equipment and plumbing schedules need to establish that match before the order is released. They also identify the inlet connector and accessible shutoff arrangement, so the toilet and water service are specified together.
How is the U5 matched to an existing toilet drain?
The selected floor-drain center is 300 mm from the finished rear wall. A matching U5 outlet and connector drawing must establish that fit before the order is released. The coordination plan reserves a 450 × 750 mm fixture zone within a 900 × 1500 mm floor area; actual body dimensions, lid movement and service access still come from the supplied unit drawing.
Does a U5 quotation include the controller and installation work?
Both packages include on-unit controls, the matching fixing kit and itemized inlet and waste parts, and the remote package adds one compatible handheld remote and wall holder per toilet. Site electrical work, isolation valves, pipe alterations, installation and commissioning are site work unless expressly included.