Is the lowered section a shelf or a full work surface?
It is a full 750 mm-deep part of the selected counter, at 750 mm above the floor, beside the 1100 mm-high ledge. The open space below it is retained for a front approach. A narrow front-mounted shelf is a different design.
What are the dimensions of the selected reception counter?
The selected run is 2400 mm wide and 750 mm deep. The high section is 1600 mm wide; the low section is 800 mm wide. Both widths, the position of the lowered section and the overall depth can be revised together on the project drawing.
How much clear space is under the low section?
The selected opening is 764 mm wide and 725 mm high, with 600 mm of front-to-back depth kept clear. These values follow the specified 800 mm section, 18 mm side panels and 25 mm top. Drawers, front rails and floor plinths are excluded from that volume.
Can the lowered section move to the left end?
Yes. The high and low modules can be mirrored for the visitor route and staff position. The end-panel finishes, support junction and cable layout are revised with the handing; the order drawing records the visitor-facing orientation.
Can storage and electrical fittings be included?
Yes. Staff-side drawers or cupboards can go in the high section, with selected hardware and service access. Power and data fittings are named components kept clear of the lowered knee bay, and wiring and connection are done on site.
Can the lowered counter be adapted to our accessibility requirements?
The low surface height, service width and knee space can be adjusted with the counter layout. The project designer reviews the approach space and room circulation before the shop drawing is approved, and the quotation records the agreed dimensions and what we supply.