What glass is specified for the JY-223 sliding shower door?
The specification is 8 mm ultra-clear tempered glass. The order also needs the panel dimensions, edge details and hardware positions for the selected layout. Any required project-specific glazing documentation belongs with that glass specification.
Which frame and handle finishes are listed?
Black, Silver and Brushed Titanium are the listed frame and stainless-steel handle finish choices. The selected finish applies to the door package in the quotation. Adjacent shower fittings can be compared against the same accepted finish selection, especially where their color names are similar but their sheen or tone differs.
Are both shower panels sliding, and can the opening be reversed?
The ordered layout must identify the moving panels and opening side. JY-223 is a two-panel sliding configuration, but the exact panel movement, travel and handing belong to the selected assembly. The required clear entry and nearby fixtures should be shown with that layout before the glass and hardware are ordered.
What measurements are needed to size a sliding shower door?
Use the finished opening after tile or wall-panel dimensions are established. Record widths at the top, middle and bottom, opening height, wall plumb and base level. The selected assembly’s installation range and clear entry must fit those measurements; the dimensions of an unfinished stud opening or a nominal shower base are a different reference.
Can JY-223 be used for a floor-level shower entrance?
That requires a compatible threshold and guide arrangement, coordinated with the finished floor, drainage and waterproofing. The selected assembly’s base detail determines the entrance condition. A low or absent threshold should be specified as a project requirement so the glass, guides and seals can be assessed as one package.
Does the shower door price include a base and installation?
The door package covers the glass, frame finish, sliding hardware and stainless-steel handle, with each component itemized in the quotation. A shower base, shower fittings, waterproofing, wall preparation and installation are added only when expressly included, and freight and unloading are set for the actual shipment.